 |
| Solar Air Heating Roof for Army Fitness Facility
American Solar recently commissioned the solar air heating roof retrofit at an Army fitness facility at Fort Meade, MD. The solar roof retrofit involved installation of a solar air heating metal roof and air-to-water preheat system.
Click here
for detailed case study
|
 |
| Solar Air Heating Roof for Army Maintenance Building
American Solar recently commissioned the solar air heating roof retrofit at an Army maintenance facility at Aberdeen Proving Ground, MD (APG). The solar roof retrofit involved removal of a failed corrugated concrete roof and installation of a solar air heating metal roof.
Click here
for detailed case study
|
 |
| Solar Air Heating Roof for Army Office Building
American Solar recently commissioned the solar air heating roof retrofit at an Army Office Building at the Army Research Lab in MD. The solar roof retrofit involved installation of a solar air heating metal roof, outside air preheat of roof top units, air-to-water preheat system for domestic hot water, and a high temperature solar assisted heat pump for VAV reheat.
Click here
for detailed case study
|
 |
| Radiant Barrier Under Retrofit Metal Roof Creates Solar Air Heating Roof
American Solar recently installed radiant barrier insulation in a previously retrofitted metal roof to
create a solar air heating roof. The radiant barrier insulation system reduced the solar heating load on
the old roof and building below and created air flow paths for solar heat recovery by air-to-water heating
systems.
Click here
for detailed case study
|
 |
| Solar Thermal Roofing for HHS Lab
American Solar recently completed an award-winning
campus-wide solar retrofit for an Health and Human Services (HHS) Lab.
The system involved 14 buildings and deployed nearly an acre
of solar roofing, siding, and ground mounted systems. The
overall system capacity is over 4 million BTU per hour.
Click here
for detailed case study
|
 |
|
Solar Thermal Project for NIH Campus
American Solar completed a campus-wide solar retrofit of
several buildings. The overall project was selected for special
recognition by the US Department of Energy’s -You Have
the Power Campaign.
Click here
for detailed case study
|
 |
| Large Heat Recovery System Hill AFB
American Solar installed what is probably the largest solar
heat recovery system in the US. The system captures solar
heat from the existing walls and roof of 2 buildings.
The first building is a six acre medical depot with corrugated
brown siding and a light brown metal roof. The solar-heated
air is recovered from the siding and roof for space heating
and for year round heating of a large paint booth. The total
solar roof and wall surface area used for solar heating is
approximately 10,000 square feet.
Click here
for detailed case study
|
 |
| Solar Heat Recovery for Dulles Fire Station
Many buildings at Dulles International Airport, outside Washington,
DC, are covered in corrugated metal siding painted a dark
“Dulles Gray”. Early tests showed that the siding
panel temperature exceeded 100 degrees F on a 40 degree winter
day.
Click here
for detailed case study
|
 |
| Solar Heat Recovery at USGS
The US Geological Survey Headquarters is a one-million square
foot laboratory in Northern Virginia. The campus includes
several buildings, housing laboratories, computer facilities,
and a separate heating and cooling plant. American Solar has
installed several ground-mounted emergency generator heating
systems, constructed a building with solar heating roof and
walls over two large emergency generators, and installed a solar
heat recovery system on two metal walls.
Click here
for detailed case study
|
 |
| Ground-mounted Solar Heat System USDA
The US National Arboretum is a research laboratory of the
US Department of Agriculture. The Arboretum operates greenhouses
in Maryland to support the research efforts. American Solar
installed solar heating systems to provide heat to the greenhouses
and help control the daily temperature swings that put plants
at risk during the spring and fall months.
Click here
for detailed case study
|